Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
A useful page about what is North Bay Rubber Surfacing names the job, the constraint, and https://north-bay-rubber258372.boxmoneyblog.com/62011541/questions-people-ask-about-cement-flooring-before-the-first-visit