Installation Overview At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance framework, enhancing operational resilience and delivering measurable decreases in both power usage https://moodjhomedia.com/story3326578/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-cut