1

High-Efficiency 400 kW Chiller Installation Achieves £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance framework, enhancing process stability and achieving measurable reductions in both energy consumption https://sociallytraffic.com/story5691468/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story